Objective:
- To propose a solution for addressing the traffic management challenges in the vicinity.
- Bringing all the stakeholders together on reviewing the proposal and implementing the same.
| Sl.no |
Location |
Issue |
Recommendations |
Image |
1.
|
Bus stop on the stretch towards ITPL |
Haphazard stopping of buses. Buses spilling over to main carriage way. |
A separator dividing bus bay and the main road |

|
| 2. |
Bus bays at the down ramp of KR bridge towards Indiranagar |
Infrequently used bus bays. |
Provide a separator and stricter enforcement to utilize the space by BMTC and BTP. |

|
| 3. |
Buses stop at the up ramp of KR bridge |
Traffic build up on the main carriage way |
Provision of bus bay 300mts behind |

|
| 4. |
Opposite the mosque |
Potholed stretch |
Pave the stretch |
|
| 5. |
Narrow stretch below cable stayed bridge |
Traffic congestion |
Stretch needs to be widened and paved |

|
| 6. |
Un-manned sections(opposite tin factory) |
High pedestrian volumes |
Pedestrian crossing facilities - skywalks |

|
| 7. |
Stretch below the cable stayed |
High pedestrian volumes |
Pedestrian crossing facilities - skywalk |

|
Map key - Number points described in the table above